Hi Zia
Didn't we hire a drilling manager from Halliburton around about the beginning of August last year?
I've had a quick look through the ANN and can't find the one pertaining to this but I'm sure we did something like this last year.
This might have been a master move on SG's part as I'm sure it would go a long way to having a foot in the door so-to-speak with Halliburton for the rig issue and possibly a JV.