I'd be supprised if the 'P' was a greater cost that the 'R'. The rail consists of 500kms track with 10 bridges and runs through some tricky terrain -all to be done with limited construction water i assume...
I'd be supprised if the 'P' was a greater cost that the 'R'. The...
Add to My Watchlist
What is My Watchlist?