PUA 0.00% 0.4¢ peak minerals limited

There is no shortage of suitable Kaolin and HEG and ATC have...

  1. rex
    178 Posts.
    There is no shortage of suitable Kaolin and HEG and ATC have plenty
    It all comes down to plant design and construction
    It should cost over $150 million and take a few years to get a BFS and financing in place
    With an experienced EPC contractor the project should be robust with excellent returns
    However Orbite's project failed due to poor design to handle inferior ores
    So I suggest watching ATC closely and keep in mind how long it has taken them to get to the design and financing stage
    I think ATC have excellent prospects and HEG should follow along (CPS floated ATC)
 
watchlist Created with Sketch. Add PUA (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $4.166M
Open High Low Value Volume
0.4¢ 0.4¢ 0.4¢ $800 200K

Buyers (Bids)

No. Vol. Price($)
7 9321666 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 2230687 7
View Market Depth
Last trade - 10.06am 21/06/2024 (20 minute delay) ?
PUA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.