SRL 0.00% 41.0¢ sunrise energy metals limited

$7.50 incl sulphate premium. Up to $2.50 for Ni sulphate...

  1. 10,858 Posts.
    lightbulb Created with Sketch. 949
    $7.50 incl sulphate premium. Up to $2.50 for Ni sulphate premium. $5.23+$2.50 = $7.73lb

    Also allow for increase in cobalt tonnage to 5000t pa not incorporated into PFS.

    Also add 80t pa of Scandiun oxide by product @ $1500kg not incorporated into PFS. As by product costs will be minimal.

    Plus addition of platinum not incorporated into PFS.

    Revised NPV and IRR to come in DFS Q1 2018 and the Chinese know it.
 
watchlist Created with Sketch. Add SRL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.