And actually, its $5.7B (net present cost in 2009) includes the maximum water output.
"The maximum total cost of the VDP over the 30-year contract published in the Project Summary is $5.7 billion (NPC 2009 when the contract was signed).
This includes the capital cost of $3.5 billion as well as the ongoing operating costs for each year and annual maximum water orders of 150 billion litres for 27.75 years (the initial full contract operation period).
This cost has already reduced because water has not been ordered and savings have been made"
https://www.water.vic.gov.au/__data...54202/Fact-sheet-project-costs-March-2015.pdf
- Forums
- ASX - By Stock
- TLS
- Where to now for long term investors of Telstra
Where to now for long term investors of Telstra, page-1816
-
- There are more pages in this discussion • 10,954 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TLS (ASX) to my watchlist
(20min delay)
|
|||||
Last
$3.87 |
Change
-0.010(0.26%) |
Mkt cap ! $44.71B |
Open | High | Low | Value | Volume |
$3.86 | $3.88 | $3.84 | $59.79M | 15.47M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 192374 | $3.87 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$3.88 | 443082 | 19 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 192374 | 3.870 |
2 | 2680 | 3.860 |
16 | 378816 | 3.850 |
14 | 102322 | 3.840 |
11 | 63908 | 3.830 |
Price($) | Vol. | No. |
---|---|---|
3.880 | 393082 | 18 |
3.890 | 293201 | 7 |
3.900 | 322632 | 32 |
3.910 | 203310 | 28 |
3.920 | 328211 | 19 |
Last trade - 16.10pm 05/11/2024 (20 minute delay) ? |
Featured News
TLS (ASX) Chart |