kingpin-Z:
We have stopped drilling 69 meters shy of the original target depth due to the gamma/resistivity logs indications that we are now in the reservior! If we were to continue drilling we would no doubt hit the pocket of water which can be found under any strat of hydrocarbons; this is something you do not want! The logs have identified hydrocarbons within the formation... to what porosity / permeability we do not know if it's commercial... hence we have not an clue whether we can sell it or not! That is why we are running a liner... so we can go in with wireline and get a better look at what is down there, post drilling. Once we have run the liner in about 2 days we will cement, wait for that to dry before then going in with the wireline. This operation will take a couple of days depending on how much of the hole we will log. So to conclude we get back to you when we feel like it. More likely after we have sent the final wireline logs back to town for evaluation by the analysts.
- Forums
- ASX - By Stock
- where we are at
kingpin-Z:We have stopped drilling 69 meters shy of the original...
-
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RRS (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online