ADY 0.00% 1.1¢ admiralty resources nl.

JAPONESITA TENEMENT RESOURCE UPGRADE47.0 MILLION TONNES AT 21.6%...

  1. 253 Posts.
    JAPONESITA TENEMENT RESOURCE UPGRADE
    47.0 MILLION TONNES AT 21.6% Fe
    Headline Summary
    • Japonesita Indicated and Inferred Resource Estimation increased by 5.0 million
    tonnes to 47.0 million tonnes at 21.6% Fe;
    • The mine is beneficiating ore as low as 9%, providing a potential indicated and
    inferred resource of 66.2 million tonnes at 18.8% Fe.
    • Environmental permitting for Japonesita/Japonesa/Mirador will enable expansion
    of production to 3.9 million tonnes p.a.
    • At a seven to one ratio using 18.8% iron ore, the mine is capable of producing
    9.45 million tonnes of final product, giving this area at 2.0m tonnes per annum
    nearly five years mine life and US$434m at 2007 benchmark prices.
    The board of directors are pleased to advise that we have received the attached letter from
    SRK, our Geological consultants in Chile, indicating a reserve upgrade at the JORC inferred
    and indicated level for the tenement adjacent to our existing mine pit, Japonesita as follows:
 
watchlist Created with Sketch. Add ADY (ASX) to my watchlist
(20min delay)
Last
1.1¢
Change
0.000(0.00%)
Mkt cap ! $17.92M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
3 1574693 1.0¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 882872 3
View Market Depth
Last trade - 16.12pm 03/07/2024 (20 minute delay) ?
ADY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.