PLS 3.52% $2.94 pilbara minerals limited

2.3 Port Loading Once a chartered ship is berthed, Rotaboxes...

  1. 240 Posts.
    lightbulb Created with Sketch. 114
    2.3 Port Loading Once a chartered ship is berthed, Rotaboxes will be loaded within the confines of the Port Hedland storage facility before being transferred to the Port (Berth 1 or 2) by trucks. Rotabox lids are secured and sealed within the enclosed storage facility and Rotaboxes checked by personnel for any external hung-up Concentrate prior to leaving the facility. Each truck will carry 3 Rotaboxes during a loading campaign and it is expected 7 triple road trains shall operate in a continuous rolling circuit from the storage facility to the berth.

    The expected loading time for a 20,000t cargo is 55 hours at an average load rate of 365t per hour. No full Rotaboxes will be held on site (at Port) for extended periods and all empty Rotaboxes will be immediately returned to the storage facility in Port Hedland.

    https://www.der.wa.gov.au/images/do...for_spodumene_concentrate_export_A1570258.pdf

    You can crunch some numbers from there for approx Rotabox capacity but it seems to be a figure closely kept to QUBE's cheset.

    J
 
watchlist Created with Sketch. Add PLS (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.