@WombatKeith there is only one problem - rail capacity.
Both directions - north for Arrowsmith and south for Muchea - are single rail lines and each is limited to 4mtpa capacity. Obviously some sidings to allow for two-way traffic is the solution but who will pay?
Ramp up for each project is one 12hr shift to produce 1mtpa and once settled down adding the 2nd shift for 24/7 operation.
BM has said that the most likely scenario is one offtaker for each project and those offtakers will be multinationals with big balance sheets.
Almost certainly Mitsubishi will be one of them. Smooth sailing direct to India where M dominates the car glass industy with >75% mkt share. There are some big ethical supply problems in India. The other Arrowsmith project could supply South Korea foundries.
Muchea is ideal for the ultra-clear flat glass mkt e.g. solar panels. The top 10 manufacturers are Chinese. At least two have operations in Malaysia.
Notice the diversity? Not a bad business plan.
There's a 10-bagger here for those who are patient.
- Forums
- ASX - By Stock
- Whilst we wait...
@WombatKeith there is only one problem - rail capacity.Both...
-
- There are more pages in this discussion • 1,375 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VRX (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $25.13M |
Open | High | Low | Value | Volume |
4.0¢ | 4.2¢ | 3.9¢ | $2.395K | 57.50K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 27220 | 4.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.2¢ | 81683 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 27220 | 0.040 |
2 | 261877 | 0.039 |
4 | 237210 | 0.038 |
1 | 91072 | 0.037 |
2 | 255555 | 0.036 |
Price($) | Vol. | No. |
---|---|---|
0.042 | 81683 | 1 |
0.044 | 250000 | 1 |
0.045 | 187000 | 2 |
0.047 | 38619 | 2 |
0.048 | 296773 | 2 |
Last trade - 15.45pm 01/11/2024 (20 minute delay) ? |
Featured News
VRX (ASX) Chart |