Beside drilling for the pit design which is mandatory I am sure the pit mineralisation will be nothing to what lies below
and I am sure that while the drilling is in operation for the pit they will test the deeps and it will confirm that Rex is sitting
on a monster . I say this from a previous presentation and it well could be bigger than what was previously expected.
Add to My Watchlist
What is My Watchlist?