BHP has a history of catastrophic mining disasters, I don't think they will get away with paying 28.6M this time
FYI
In 1999, BHP reported that 90 million tons of mine waste was annually discharged into the river for more than ten years and destroyed downstream villages, agriculture and fisheries. Mine wastes were deposited along 1,000 kilometres (620 mi) of the Ok Tedi and the Fly River below its confluence with the Ok Tedi, and over an area of 100 square kilometres (39 sq mi). BHP's CEO, Paul Anderson, said that the Ok Tedi Mine was "not compatible with our environmental values and the company should never have become involved."[1] As of 2006[update], mine operators continued to discharge 80 million tons of tailings, overburden and mine-induced erosion into the river system each year. About 1,588 square kilometres (613 sq mi) of forest has died or is under stress. As many as 3,000 square kilometres (1,200 sq mi) may eventually be harmed, an area equal to the U.S. state of Rhode Island or the Danish island of Funen.[2]
Following heavy rainfall, mine tailings are swept into the surrounding rain forest, swamps and creeks, and have left behind 30 square kilometers of dead forest. Thick gray sludge from the mine is visible throughout the Fly River system, although its effects downriver are not as severe.[3] Chemicals from the tailings killed or contaminated fish, although they are still eaten by the people of the surrounding villages. However, fish counts decrease closer to the mine. The massive amount of mine-derived waste dumped into the river exceeded its carrying capacity. This dumping resulted in the river bed being raised 10 m, causing a relatively deep and slow river to become shallower and develop rapids, thereby disrupting indigenous transportation routes.[4] Flooding, caused by the raised riverbed, left a thick layer of contaminated mud on the flood plain among plantations of taro, bananas and sago palm that are the staples of the local diet. About 1300 square kilometers were damaged in this way. The concentration of copper in the water is about 30 times above the standard level, but it is below the World Health Organisation (WHO) standards.[5]
The original plans included an Environmental Impact Statement that required a tailings dam be built. This would allow heavy metals and solid particles to settle, before releasing the clean ‘high-water’ into the river system where remaining contaminants would be diluted. In 1984 an earthquake caused the half built dam to collapse. The company continued operations without the dam, initially because BHP argued that it would be too expensive to rebuild it. Subsequently, the PNG government decided a dam wasn’t necessary, in the wake of the closure of the Panguna mine.[citation needed]
Most of Papua New Guinea's land is held under a system of native title, with ownership divided amongst many small clans, while the central government retains control over how resources that lie under the ground are used.
There are no waste retention facilities on the premises. This allowed all ore processing residues, waste rock and overburden to be discharged into the Ok Tedi River
In the 1990s the communities of the lower Fly Region, including the Yonggom people,[7] sued BHP and received US$28.6 million in an out-of-court settlement, which was the culmination of an enormous public-relations campaign against the company by environmental groups. As part of the settlement a (limited) dredging operation was put in place and efforts were made to rehabilitate the site around the mine. However the mine is still in operation and waste continues to flow into the river system. BHP was granted legal indemnity from future mine related damages.
In January 2007 PNG lawyer Camillus Narokobi lodged a lawsuit on behalf of 3,000 villagers known as the Ninggerum people who live near the Birim River, a tributary of the Ok Tedi River. He is seeking US$4 billion in damages.[8]
The Ok Tedi Mine was scheduled to close in 2013.[9] However, the PNG Government has taken over control of the mine and with support of local community, the mine life was extended.[10][11] Until that time two thirds of the profits go into a long-term fund to enable the mine to continue to contribute to the PNG economy for up to half a century after it closes. The balance is allocated to current development programs in the local area (Western Province) and PNG more generally. Experts have predicted that it will take 300 years to clean up the toxic contamination
Source Wiki.
I hope all the people in that mud , working away cleaning up searching are ok to be exposed to whatever was in that tailing dam.
A terrible accident, presumably a very big problem financial liability for the owners.
- Forums
- ASX - By Stock
- BHP
- Who's responsible
Who's responsible, page-7
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BHP (ASX) to my watchlist
(20min delay)
|
|||||
Last
$40.01 |
Change
-0.540(1.33%) |
Mkt cap ! $203.0B |
Open | High | Low | Value | Volume |
$40.52 | $40.63 | $40.01 | $261.2M | 6.492M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
13 | 21029 | $40.01 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$40.02 | 15000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
13 | 21029 | 40.010 |
408 | 123546 | 40.000 |
14 | 4106 | 39.990 |
20 | 9220 | 39.980 |
10 | 20717 | 39.970 |
Price($) | Vol. | No. |
---|---|---|
40.130 | 800 | 1 |
40.140 | 990 | 1 |
40.160 | 7018 | 1 |
40.170 | 658 | 3 |
40.190 | 7018 | 1 |
Last trade - 16.10pm 14/11/2024 (20 minute delay) ? |
Featured News
BHP (ASX) Chart |