Say silver goes to $50/oz and MMN get there act together and start producing at an economical rate and SP of MMN goes to $1 some time before expiry.
MMN Cost 4c. SP = $1. Profit = 25 bagger. IE $1000 = $25,000
MMNOB Cost 2c. SP = 92c. Profit = 46 bagger. IE $1000 = S46,000.
BTW if you think that those figures are absurd, MMNOB example I gave here is exactly the price I paid and received with some AYO ops (now AZZ) about 9 years ago although ex price was 35c and AYO was trading about 16c with shorter expiry.
Long time between drinks, hey
MMN
macmin silver ltd
why are mmnob 2c with mmn at 4c, page-4
Add to My Watchlist
What is My Watchlist?