Say silver goes to $50/oz and MMN get there act together and start producing at an economical rate and SP of MMN goes to $1 some time before expiry.
MMN Cost 4c. SP = $1. Profit = 25 bagger. IE $1000 = $25,000
MMNOB Cost 2c. SP = 92c. Profit = 46 bagger. IE $1000 = S46,000.
BTW if you think that those figures are absurd, MMNOB example I gave here is exactly the price I paid and received with some AYO ops (now AZZ) about 9 years ago although ex price was 35c and AYO was trading about 16c with shorter expiry.
Long time between drinks, hey
- Forums
- ASX - By Stock
- MMN
- why are mmnob 2c with mmn at 4c
MMN
macmin silver ltd
why are mmnob 2c with mmn at 4c, page-4
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MMN (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
Previous Video
Next Video
SPONSORED BY The Market Online