VMM 0.00% 52.0¢ viridis mining and minerals limited

Why Colossus Scoping Study will trump MEI Caldiera, page-10

  1. 3,672 Posts.
    lightbulb Created with Sketch. 214
    Hello. Any report would not be "disgruntled". Instead, it would merely be a query about proper reporting; bringing a certain questionable/doubtful/unclear matter to the attention of the ASX. The concerns of the report itself may turn out to be completely invalid.

    Generally, there a formal stages to project development & thus disclosure, such as:

    1. JORC - done on 4/6/24

    2. Scoping Study or PFS based on Indicated JORC defining a Mining/Ore Reserve

    It is unusual to me a company would announce what may possibly give the impression to be a mining reserve, plucking a number from a JORC cut-off of 50M at 3,917 (highlighted in yellow, below), without first formally defining a Mining/Ore Reserve from an Indicated JORC.

    The JORC Code itself on page 16 says: https://www.jorc.org/docs/JORC_code_2012.pdf

    29. An ‘Ore Reserve’ is the economically mineable part of a Measured and/or Indicated Mineral
    Resource
    . It includes diluting materials and allowances for losses, which may occur when the
    material is mined or extracted and is defined by studies at Pre-Feasibility or Feasibility level as
    appropriate that include application of Modifying Factors. Such studies demonstrate that, at the
    time of reporting, extraction could reasonably be justified.




    https://hotcopper.com.au/data/attachments/6304/6304055-e3e5c7f97833d044c24d35ce3357aed5.jpg

    Last edited by GKeden: 11/07/24
 
watchlist Created with Sketch. Add VMM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.