Hello.Hello. Don't ask me. My point is it is highly unusual for me to read the impression or inference of a mining reserve in such a manner and at such a stage of project development. In Australia transport costs can be around $10/km. In the outback, projects can use 80t (double) to even 120t (triple) road trains (trucks). So here with VMM a truck appears to be driving on country roads. Its hard to imagine an 80 tonne truck. Say a 40t truck. Due to the relatively short distances, the truck must more often be loading & unloading. Say it costs US$12/km using a 40 tonne truck. Say a round trip from Northern Concessions to Cupim South is 20km. That is US$240 per 40 tonne of ore load. 40 tonnes of ore at 55% recovery and 3,900ppm is 86kg of REE. The transport cost in this scenario an extra US$2.79/kg. If its an 80 tonne truck then say an extra US$1.50/kg.
- Forums
- ASX - By Stock
- Why Colossus Scoping Study will trump MEI Caldiera
Hello. Don't ask me. My point is it is highly unusual for me to...
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VMM (ASX) to my watchlist
(20min delay)
|
|||||
Last
70.5¢ |
Change
0.005(0.71%) |
Mkt cap ! $46.47M |
Open | High | Low | Value | Volume |
70.0¢ | 72.0¢ | 69.0¢ | $258.0K | 377.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 15000 | 68.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
72.0¢ | 5000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 15000 | 0.685 |
1 | 4800 | 0.675 |
2 | 6999 | 0.670 |
1 | 5000 | 0.660 |
1 | 1526 | 0.655 |
Price($) | Vol. | No. |
---|---|---|
0.720 | 5000 | 1 |
0.730 | 13819 | 1 |
0.800 | 8000 | 1 |
0.830 | 513 | 1 |
0.850 | 5057 | 2 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
VMM (ASX) Chart |