Hmmm and I thought the SPP funds were raised for the Rail Loading and Port Facility construction costs, as stated in the December Quarterly (31/01/14)
Oh well......expect the unexpected
I'm sure the VERY HIGH-GRADE NATIVE COPPER and PRIMARY ORE that will be mined over the COMING MONTHS and then BLENDED with the HIGH-GRADE OXIDE ORE ALREADY STOCKPILED and then COLLECTIVELY CRUSHED will produce a BLENDED DSO PRODUCT to be sold to those interested Copper Smelters will solve all the ongoing costs.
Just hope there is enough ore left to feed the ~$23m largest continuous gravity jig circuit in the world.
CDU Price at posting:
$1.73 Sentiment: None Disclosure: Not Held