Or is there an option to do stage two first, it looks like stage 2 won't require train transport?
------------------------------------------- From annual report:
The timing of the second stage, however, may be brought forward following the decision by CESC, India’s third largest power utility, to undertake feasibility studies to build a 2x660MW power station adjacent to the Boikarabelo mine site. If this proceeds, the power station will use approximately half of the additional domestic grade coal from the second stage of the mine, underpinning the mine’s expansion, increasing export coal production and unlocking the full value of our resources earlier than originally planned.