Why not drill direct from the plant to the target? I estimate something like 5.8km if pythagoris theory applies.
It is probably a dumb question, Maybe drilling costs that far downhole would exceed the cost of tie-in pipe line back to plant from the surface at RGN well head?
No sign yet of any gas shows in the weekly report? Too early to get excited perhaps.
EGO Price at posting:
0.0¢ Sentiment: Hold Disclosure: Held