Shane75
you say:
"Yes we know about GLF, but thanks to the efforts of PPH it has been discovered that above ground gasification CTL plants cost about $3 Billion to build, by using UCG LNC’s commercial plant will cost about $800 million. The WTW GHG emissions from above ground gasification CTL plants are about 108% worse than traditional oil refining, by using UCG LNC can reduce that to about 8%. The cost of a barrel of deisel from above ground gasification CTL plants are about $50 more once carbon trading comes in. LNC’s price is about $28 per barrel. That why there is so much excitment about what LNC are doing."
Suspect some of these numbers that LNC are claiming are unture.
Not sure what size CTL plant you are talking about, but $800million for a 20,000 bpd is too low even for UCG. Yes UCG doesn't require a mine or surface gasifier or in LNC case an oxygen plant. But the gas cleanup section needs to be bigger, and since LNC use air gasification rather than oxygen the whole sythesis section will be about 50% bigger than that normally required for a CTL plant. So overall I don't believe UCG based CTL plant will be a factor of four to five cheaper than surface gasification for the same plant capacity.
The GHG claims by LNC are unsubstantiated and I challenge anyone to post calculations demonstrating HOW this can be achieved without a carbon capture and sequestration facility of some type (which LNC state is not included).
- Forums
- ASX - By Stock
- LNC
- why the big selloff
why the big selloff, page-71
Featured News
Add LNC (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Will Souter, CFO
Will Souter
CFO
Previous Video
Next Video
SPONSORED BY The Market Online