DSE 0.58% $3.45 dropsuite limited

why the interest?

  1. 67 Posts.
    Very positive and the sky is blue.

    As stated in Fridays announcement

    Transition from explorer to evaluation and producer

    Change in focus from explorer to producer
    Scoping study has transformed our view on Juno
    and confirmed our view on operations
    A change in our Management team to steer the
    transition
    A plan is in place to move our Tenant Creek
    resources to reserve by mid 2010 and be ready
    to operate at the end of that year.



    Plan to be ready to mine in 2010

    Tenant Creek JORC resource of 1.2m oz
    and growing
    Reserve drilling commencing in Q3 2009
    Targeting 1 million oz of reserves in the
    life of mine plan by 2010
    Processing options and costing under
    analysis
    Scoping study targets average production
    of 80,000 oz pa over 10 years indicative
    cash cost of approximately A$360/ oz

    Resource Potential
    All resources are open in at least one dimension
    High potential from Nobles Nob mullock dumps and tails
    Multiple prospective resource targets
    Long term target is to increase resources to 2m oz


    The open pit mining of Juno is a game changer

    Production of up to 140,000 oz per annum
    Cash cost estimate of approximately A$360/oz
    Robust economics at US$750/oz gold price
    Juno stripping funded through the early
    development of shallow oxide pits
    A range of processing options available
    Robust project financials
    Pathways to value are now clear and defined

    Alls Good
 
watchlist Created with Sketch. Add DSE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.