The plan is to truck the direct shipping ore (stage 1). Trucking is high opex but low capex. The company would then build a conveyor for stage 2 (the conveyor belt is low opex but high capex).
Cash flow funds from stage 1 will be used to fund the cost of the conveyor, thereby minimizing dilution and/or debt.
Does anyone know where a conveyor of that length (40km or so) is already in use? Rio? BHP?
cheers
Rosco
The plan is to truck the direct shipping ore (stage 1). Trucking...
Add to My Watchlist
What is My Watchlist?