    TOW CREEK (Comet Ridge 37.5% and Operator)
    As of report time (3pm, 5 February Denver time – 7am, 6 February Perth time) the
    Diamondback Energy completion rig was still attempting to recover part of the work
    string that is stuck in the hole at 5,317 feet. Some progress was made over the
    weekend so the recovery attempts will continue for another two days.
    Oil and gas continue to be produced in the circulating mud stream. This and the
    presence of extensive fracturing in the main reservoir horizons (the first and second
    benches of the Niobrara Formation) provide significant incentive to continued attempts to
    complete the well.
    Should the fishing attempts prove unsuccessful; the well will be temporarily suspended
    until a drilling rig can be brought in to complete the fishing job or to sidetrack the well.
    BEAR RIVER (Comet Ridge 33.75% and Operator)
    The Peltier 11-12 well reached a total depth of 6,700 feet on 31 January. The well was
    drilled under budget and faster than projected. A 5 ½ inch production liner was
    successfully run to total depth, with 700 feet of perforated pipe being set across three
    reservoir intervals (the first, second and third benches of the Niobrara Formation).
    Preliminary interpretation of the drilling parameters, geological samples and the electric
    line logs, including a specialised imaging tool, concluded that the all three reservoir
    targets, the first, second and third “benches” of the Niobrara Formation are fractured (the
    COMET RIDGE LIMITED
    ASX ANNOUNCEMENT
    6 FEBRUARY 2007
    fractures provide the flow path and storage mechanism in these reservoirs). Oil and gas
    shows, including an incidence of free oil in the mud pit, were observed throughout all
    three objectives.
    Cyclone Rig 16 was released from the Peltier 11-12 on 4 February, 2007.
    The well will be completed for testing/production with the Diamondback Energy rig
    currently on the CVU 31-4 well. The completion simply entails running an electric
    submersible pump to TD and installing temporary power and production facilities.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
11.0¢
Change
-0.005(4.35%)
Mkt cap ! $131.6M
Open High Low Value Volume
11.5¢ 12.0¢ 11.0¢ $65.48K 573.8K

Buyers (Bids)

No. Vol. Price($)
16 603081 11.0¢
 

Sellers (Offers)

Price($) Vol. No.
11.5¢ 184524 3
View Market Depth
Last trade - 16.10pm 19/09/2025 (20 minute delay) ?
COI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.