    Engineering consultant, Lower Quartile
    Solutions Pty Ltd (LQS) was engaged to
    run provisional open pit optimisations
    using Whittle software on the Indicated
    portion of the Maitland Mineral Resource.
    The optimisations were run using a range
    of copper prices ranging from A$3,500 per
    tonne to A$10,000 per tonne. Cost
    parameters were provided by Glengarry
    and analysed by LQS to ensure they were
    robust estimates.
    The optimisation results indicate positive
    cash flows are possible from copper prices
    as low as A4000 per tonne. The
    Scoping Study assumes that ore will be
    transported to a mill up to 350 kilometres
    away and that limited infrastructure would
    be required on site.


    I would love to see the complete report but i suppose that is not available to the public.
 