    Wide high grade intersection 150m below Rocket Lode at Frog’s Leg

    HIGHLIGHTS:
    • MERC641D intersected 33m @ 3.64g/t Au including 6m @ 11.19g/t Au
    and 2m @ 25.06g/t Au.
    • The intersection is 150m below the currently defined Indicated resource at Rocket and confirms the extension to the southerly plunging high grade shoot.

    Dioro Exploration NL (TSX: DIO, hereinafter "Dioro" or the "Company"), with joint
    venture partner La Mancha Resources Inc., are pleased to announce a high-grade
    intersection at the Frog’s Leg gold project giving the deposit exciting scope for
    extension. MERC641D intersected 33m @ 3.64g/t Au from 615m including 6m @
    11.19g/t Au from 615 metres and 2m @ 25.06g/t Au from 615 metres. ( Figure 1,
    Table 1)
    MERC641D was one of the last holes to be drilled as part of the 2007 diamond
    drilling program. The intersection is significant as it is located 500m below the
    surface, 150m below previous drilling and below the new March 2008 resource
    envelope at Rocket. The wide, high-grade intersection confirms the southerly
    plunging high-grade shoot shown by geological modeling incorporating the 2007
    drilling. (Figure 2)
    MERC641D was not included in the resource upgrade reported on the 1st April 2008
    indicating that the Frog’s Leg resource will continue to grow as extensional drilling is
    conducted. Potential remains to extend the resource at depth and in particular along
    strike to the south.
    Results are also available for five other diamond holes drilled as part of the
    2007 program. MEDD135-7 were drilled in the upper northern portion of the Mist
    lode to close of the resource in this area. MEDD138 and MERC637D were drilled
    below the Gap and intersected lower grade mineralisation. (Table 1)
    Next Steps
    Diamond drilling is planned to test below the Tinker lode in the second quarter of
    2008. The lower part of Tinker is within the newly identified south plunging shoot
    confirmed by the intersection in MERC641D. Results from Tinker should be
    available in August.
    The Frog’s Leg underground mine has been producing ore for the past two months,
    with all ore being transported to Dioro’s Jubillee Mill for processing for the joint
    venture. Frog’s Leg is expected to commence contributing to Dioro’s Production by
    June 2008.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.