I think ru-serious got a little excited there....as I read it it is saying (below) that Jun16 LNG is scheduled to provide FERC the Quality Control Procedures and Site prep drawings and specs....
"Magnolia LNG LLC
FERC Docket No. CP14-347-000
Implementation Plan
______________________________________________________________________________
IP-20
The schedule for providing this information to FERC is as follows: Compliance Item Schedule
a. Quality control procedures to be used for civil/ structural design and construction Jun-16
b. Site preparation drawings and specifications Jun-16
c. LNG storage and foundation design drawings and calculations Sep-17
d. LNG terminal structures and foundation design drawings and calculations Oct-17
e. Seismic specifications for procured equipment Aug-17"
LNG Price at posting:
61.0¢ Sentiment: Hold Disclosure: Held