AGL 0.96% $10.27 agl energy limited.

"stabilisation of the Grid will have been completed by 2026...

  1. 2,328 Posts.
    lightbulb Created with Sketch. 90
    "stabilisation of the Grid will have been completed by 2026 allowing full renewable fed-in, base-load will be enabled by pumped hydro and battery storage, again by 2026."

    How much would this cost and who should pay for it?

    i would be very interested in seeing your numbers and the basis for them.

    The best pumped storage sites are already developed, and Snowy 2.0 is well over budget and schedule.

    i don't know if there are enough battery metals in the world to supply that amount of battery storage.

    And did you really mean 2126?



 
watchlist Created with Sketch. Add AGL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.