Here are some numbers:
1600m x 600m x 15m x 2.7 SG = 38.9mt of ore.
If the average grade was consistent at around 1,000 g/t ag
38.8 * 1000g/t Ag / 31.1 g/oz = 1.25B oz Ag
These calculations show that if the next 21 holes come back with high grade then this will be a huge deposit. It is a big "if" though however shows the potential scale of what we are dealing with here.
For this reason alone I am happy to have a position in OGX.