Architects typically do not determine the process of how a Contractor will build the building. They provide design and technical parameters which shall be met.
Should the Hadrian be able to do what a brikie can do at lower costs and quicker, then there is a fundamental use case for it. Until face brick can be dealt with by FBR as per the industry standard, wide scale adoption will not occur.
Architects won't waste time designing a building solely for the Hadrian to build (in this or any climate). It is way too risky as time and cost pressures far outweigh tinkering with experimental tech.
- Forums
- ASX - By Stock
- FBR
- Willagee Builds
Willagee Builds, page-946
-
- There are more pages in this discussion • 205 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.9¢ |
Change
-0.009(18.8%) |
Mkt cap ! $174.0M |
Open | High | Low | Value | Volume |
4.4¢ | 4.4¢ | 3.8¢ | $1.550M | 38.49M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 128108 | 3.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.0¢ | 600000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 128108 | 0.039 |
20 | 1920222 | 0.038 |
10 | 1202661 | 0.037 |
7 | 828765 | 0.036 |
14 | 1407691 | 0.035 |
Price($) | Vol. | No. |
---|---|---|
0.040 | 600000 | 2 |
0.041 | 225643 | 3 |
0.042 | 366418 | 2 |
0.043 | 1100000 | 6 |
0.044 | 680000 | 5 |
Last trade - 16.10pm 05/08/2024 (20 minute delay) ? |
Featured News
FBR (ASX) Chart |