the Bpt monthly drilling report is due any day,
based on the fact the one in January was submitted on the 12th,
This will have the updates for the Moonta 1 well in PEL 218
as well as should have further information on:
Beach Operated Cooper Basin Unconventional Gas Program
A workover rig is milling out a packer within the Encounter-1 wellbore in PEL 218 (Beach 100%) to enable the commencement of fracture stimulation activities now expected to occur in mid February.
SO, i expect at least part of the action is from punters lining up for these releases, not necessarily a leaky ship from Icon.
- Forums
- ASX - By Stock
- wishful thinking?
the Bpt monthly drilling report is due any day, based on the...
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ICN (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.608M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ICN (ASX) Chart |
Day chart unavailable