re: wme is running now Correction to earlier post.Previous drilling at Marenica was 2000 holes (not 2000m) , a total of 32,000m of drilling was completed in the 70's.SALTY
LU7 The Breakdown: Lithium Universe talks refinery design and lithium processing in strong preliminary feasibility study for Bécancour