BPH 4.55% 2.1¢ bph energy ltd

After the vessel is launched, manoeuvring trials take place as a...

  1. 133 Posts.
    lightbulb Created with Sketch. 29
    After the vessel is launched, manoeuvring trials take place as a part of the sea trials and help assess the vessel’s manoeuvring ability and performance under different modes of operation. These manoeuvring trials are based on the plausible manoeuvres the ship must undergo during its lifetime under different situations it may encounter.

    As per the guidelines for manoeuvring trials from the MSC 76 codes of IMO, all sea-going vessels above 100 metres in length are required to undergo these manoeuvring trials. And irrespective of length, all gas and chemical tankers must undergo them after launching and before delivery to the client.

    All planning and high-speed crafts are exempted from the requirements of manoeuvring trials as they have entirely different hydrodynamics of motion. Some common manoeuvring trials are turning circle, zig-zag, spiral, reverse-spiral and full astern stopping tests.

 
watchlist Created with Sketch. Add BPH (ASX) to my watchlist
(20min delay)
Last
2.1¢
Change
-0.001(4.55%)
Mkt cap ! $24.09M
Open High Low Value Volume
2.2¢ 2.2¢ 2.1¢ $50.00K 2.303M

Buyers (Bids)

No. Vol. Price($)
19 3462275 2.1¢
 

Sellers (Offers)

Price($) Vol. No.
2.2¢ 509894 2
View Market Depth
Last trade - 16.10pm 28/05/2024 (20 minute delay) ?
Last
2.1¢
  Change
-0.001 ( 4.55 %)
Open High Low Volume
2.2¢ 2.2¢ 2.1¢ 1446919
Last updated 15.57pm 28/05/2024 ?
BPH (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.