There is the technology available today to bring a gas line onshore via a tunnel under the 5.5km "NSW Coastal Waters" and pop up onshore. It was done for Chevron on the Wheatstone project in Onslow WA to avoid disturbing the turtle nesting areas.
"The total weight of the line pipe required is about 200,000 tonnes. The trunkline crosses the shore via a micro- tunnel. This involved drilling a horizontal tunnel about 3m in diametre for 2km under the shore crossing to avoid coastline disturbance."
- Forums
- ASX - By Stock
- Wooooo Hooooo Go BPH :)$$$$$$
There is the technology available today to bring a gas line...
-
- There are more pages in this discussion • 12,121 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BPH (ASX) to my watchlist
|
|||||
Last
1.8¢ |
Change
-0.001(5.26%) |
Mkt cap ! $20.65M |
Open | High | Low | Value | Volume |
1.9¢ | 2.0¢ | 1.8¢ | $91.52K | 4.868M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 1956600 | 1.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.9¢ | 1000000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
9 | 1956600 | 0.018 |
18 | 3032691 | 0.017 |
4 | 1814389 | 0.016 |
6 | 1016667 | 0.015 |
1 | 310000 | 0.013 |
Price($) | Vol. | No. |
---|---|---|
0.019 | 1000000 | 1 |
0.020 | 2757675 | 21 |
0.021 | 2677921 | 9 |
0.022 | 1182559 | 6 |
0.023 | 1536508 | 6 |
Last trade - 15.48pm 28/06/2024 (20 minute delay) ? |
Featured News
BPH (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online