BPH 0.00% 2.0¢ bph energy ltd

Well I don’t. It’s just basic research and connecting the dots...

  1. 3,873 Posts.
    lightbulb Created with Sketch. 841
    Well I don’t. It’s just basic research and connecting the dots to the potential.
    See my post here;
    https://hotcopper.com.au/posts/71517319/single

    I will also add
    drill rig time frame 35 days,
    Valaris fleet status report showing Jan-Feb for a drill rig for an undisclosed operator in Aus waters.
    We are drilling in the first half of 2024.
    Cross referenced many drill rig operators in Aus and nothing is available let alone “booked” for 1-2 months time frame. (I used the word booked here based of fleet status reports)
    Rig specifications adhere to PEP11 water depths etc.
    Environmental permits you say? NOPSEMA have had our enviro plan since 2022 - it’s not new to them.
    Parliament doesn’t get back till Feb (could we have a rig on permit before then??)

    Speculation with a fair chunk of research I’ve done which lines up Valaris 107 and our permit. Make of it what you will
    Last edited by MrMysterious: 31/12/23
 
watchlist Created with Sketch. Add BPH (ASX) to my watchlist
(20min delay)
Last
2.0¢
Change
0.000(0.00%)
Mkt cap ! $22.95M
Open High Low Value Volume
2.0¢ 2.0¢ 2.0¢ $20.53K 1.026M

Buyers (Bids)

No. Vol. Price($)
27 6053401 2.0¢
 

Sellers (Offers)

Price($) Vol. No.
2.1¢ 769388 7
View Market Depth
Last trade - 16.10pm 04/06/2024 (20 minute delay) ?
Last
2.0¢
  Change
0.000 ( 0.00 %)
Open High Low Volume
2.1¢ 2.1¢ 2.0¢ 1642085
Last updated 15.40pm 04/06/2024 ?
BPH (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.