GNG 0.91% $2.18 gr engineering services limited

Joe Totaro recently resigned from his position at Tectonic...

  1. 2,451 Posts.
    lightbulb Created with Sketch. 166
    Joe Totaro recently resigned from his position at Tectonic Resources. Suspect that he did this to avoid a conflict of interest situation when GR Engineering bid for the construction phase contract for the Phillips River Project near Ravensthorpe.

    GR were responsible for the engineering design and definitive feasibility study for TTR's project and must be considered front runners for the bigger job.
 
watchlist Created with Sketch. Add GNG (ASX) to my watchlist
(20min delay)
Last
$2.18
Change
-0.020(0.91%)
Mkt cap ! $363.8M
Open High Low Value Volume
$2.20 $2.23 $2.18 $588.9K 267.9K

Buyers (Bids)

No. Vol. Price($)
1 2246 $2.18
 

Sellers (Offers)

Price($) Vol. No.
$2.19 4070 1
View Market Depth
Last trade - 16.10pm 27/06/2024 (20 minute delay) ?
GNG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.