NSW is littered with failed solar thermal plants.
In March 2018 ARENA said [...concentrated solar thermal (CST) technology could be a commercially viable form of dispatchable renewable energy within a decade.]
I think ARENA were closer to reality in 2018.
Taxpayers should be alarmed ARENA will waste their dough on this latest proposal.
- Forums
- Science & Medicine
- World-first dispatchable Raygen solar thermal plant to be built in Victoria
NSW is littered with failed solar thermal plants.In March 2018...
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)