    100% lots of site work is required on top of what already done as the BFS requires additional feasibility studies on engineering, infrastructure construction, accessibility of terrain, geology, mining procedures, processing plant construction, water and waste management, supplier and vendor estimates. A plan for closing the mine and reclaiming the ground, with full environmental impact studies, will also be needed. The more money the project can be projected to make the easier it would be to find a source for whatever portion is required to be financed
 