FAR 0.00% 50.0¢ far limited

WPL development lead not operator, page-2

  1. 172 Posts.
    lightbulb Created with Sketch. 6
    From WPL report

    As Development Lead, Woodside is actively progressing the SNE Field Development, offshore Senegal. Phase 1 of the proposed development is focused on the less complex lower S500 reservoir units. In February 2018, Woodside released invitation-to-tender packages to pre-qualified contractors for the FPSO facility, supporting subsea infrastructure and drill rig. Responses have been received and are under evaluation ahead of targeted FEED entry in Q4 2018. In June 2018, the draft Environmental and Social Impact Assessment (ESIA) Report was submitted to the Direction de l’Environnement et des Etablissements Classés in Senegal. Public consultation on the ESIA will commence in Q3 2018. Subsequent to the period, the joint venture submitted the SNE and FAN Field Development Evaluation Report to the Government of Senegal in accordance with the Production Sharing Contract. The Evaluation Report summarises the technical and economic data relating to the SNE and FAN fields. Following this, the joint venture is targeting the submission of the Exploitation Plan in H2 2018. The joint venture is considering undertaking further 3D seismic work across the SNE field in H1 2019. The 3D seismic work would improve the resolution and quality of existing data with a focus on the S400 reservoir, as well as support development planning by optimising production and water injection well design.
 
watchlist Created with Sketch. Add FAR (ASX) to my watchlist
(20min delay)
Last
50.0¢
Change
0.000(0.00%)
Mkt cap ! $46.20M
Open High Low Value Volume
50.0¢ 50.0¢ 50.0¢ $2.305K 4.609K

Buyers (Bids)

No. Vol. Price($)
1 17688 50.0¢
 

Sellers (Offers)

Price($) Vol. No.
50.5¢ 88712 1
View Market Depth
Last trade - 16.10pm 16/08/2024 (20 minute delay) ?
FAR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.