WR1 1.03% 49.0¢ winsome resources limited

My maths is solid.My interpretation of the facts is solid. At...

  1. 2,961 Posts.
    lightbulb Created with Sketch. 3945
    My maths is solid.

    My interpretation of the facts is solid.

    At this time, all that is needed is consistency for the 850m strike for 55mt to be achieved, and from the math of @dtab, consistency is being achieved.

    If either the main zone, footwall or both continue east 1.3klm from Jamar main to hole 45 the tonnage will be massive. >100mt as its another 1300m of strike

    This is also the case west from Jamar main. 1.1klm to old MTC holes from Jamar main.

    If anyone sees a flaw with this theory please reach out, healthy debate is always welcomed. The main issue I see with my theory is defining that the footwall comes to the surface. I am sure within the next 6 weeks we will find out. Obviously we have mineralized pegmatite with the 1300m strike i noted above, to what degree we will find out over the next 6months. My hope is the whole section and further is mineralized following the gravity survey and greenstone belt. A full 1300m and more providing a >100mt deposit.
    Last edited by Helios11: 13/06/23
 
watchlist Created with Sketch. Add WR1 (ASX) to my watchlist
(20min delay)
Last
49.0¢
Change
0.005(1.03%)
Mkt cap ! $106.0M
Open High Low Value Volume
48.0¢ 49.5¢ 46.5¢ $161.0K 336.4K

Buyers (Bids)

No. Vol. Price($)
1 30000 47.0¢
 

Sellers (Offers)

Price($) Vol. No.
49.5¢ 18235 1
View Market Depth
Last trade - 16.10pm 06/09/2024 (20 minute delay) ?
WR1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.