WR1 1.04% 47.5¢ winsome resources limited

WR1 General Discussion, page-24634

  1. 2,938 Posts.
    lightbulb Created with Sketch. 3909
    Decent answer. Both are inferred. Both require indicated for studies. Wr1 have 27k in labs.


    PMT.

    PMT baseline studies are longer than 3 years due to flora/fauna impact of either deviating or damming hydrology flow for Cv5. Its not observation, its observe then act to rectify.

    They do not have a feasible deposit outside Cv5.

    The baseline studies for lake ecosystem and palegic fish will be beyond 3 years, again due to whatever proposed engineering avenue is taken with the water flow beyond Lac Corvette - How will it effect/affect fish further on.

    Once established, indigenous consultation will be required..

    No engineering or construction can commence prior to approval.

    They will need to build something significant, or dam and mine quickly in periods minimal hydrological flow.

    Engineering nightmare.

    Wr1.

    Needs a road

    deposit at surface. At least 15mt will be ore only.

    Does not have environmental issues apart from observation over a 3years period. Commenced 2022.

    Does not need to cease activities due to geese, moose, bears or ducks. The land is class 3.

    Class 3 includes no indigenous issues (I do not know PMT, but they must stop for geese, ducks, moose etc)


    If PMT mine before Wr1 yes there are problems.



    Anyone tells me that PMT will mine first based on facts above are idiots.









 
watchlist Created with Sketch. Add WR1 (ASX) to my watchlist
(20min delay)
Last
47.5¢
Change
-0.005(1.04%)
Mkt cap ! $102.7M
Open High Low Value Volume
48.0¢ 48.5¢ 47.5¢ $194.3K 405.7K

Buyers (Bids)

No. Vol. Price($)
1 3999 47.5¢
 

Sellers (Offers)

Price($) Vol. No.
48.5¢ 3377 2
View Market Depth
Last trade - 16.10pm 12/08/2024 (20 minute delay) ?
WR1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.