WR1 6.85% 68.0¢ winsome resources limited

Infill drilling is drilling between holes already drilled right?...

  1. 1,867 Posts.
    lightbulb Created with Sketch. 290
    Infill drilling is drilling between holes already drilled right? So if I have pount a and point b tht hits i can assume with geological mapping they may connect and therefor the resource should be all the way through. Infill drilling just confirms it just like the grade. The initial mre was literally the absolute minimum the company could declare without getting into troubke. More drilling regardless if it's step out or infill confirms data and assumptions more and more
 
watchlist Created with Sketch. Add WR1 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.