WR1 0.66% 76.5¢ winsome resources limited

@Bill townEconomical? please show me why....I based my calcs of...

  1. 1,585 Posts.
    lightbulb Created with Sketch. 425
    @Bill town
    Economical? please show me why....

    I based my calcs of 1.4% originally, in future we will get that. but for the heck of it, lets crunch the numbers with 1.1% grade:

    previous;
    https://hotcopper.com.au/data/attachments/6211/6211119-9f4c08566bcb49ba22bf91bd2295a823.jpg


    We will adjust the section in red:
    https://hotcopper.com.au/data/attachments/6211/6211202-beeb3f9194ae026d6b13401b54d56bbb.jpg


    With the lithium content in the pegmatite reduced to 1.1%, approximately 7.27 tons of pegmatite would be required to produce 1 ton of spodumene concentrate with a 6% lithium content, considering the same recovery rate.

    7.27t x CAD$62.088 = CAD$451.37

    Or USD $ 330 AISC

    2.2mtpa @ 1.1% grade and 75% recovery and 85% utilization = 257Ktpa SC6 equivalent


    Here are the calculated EBITDA values in AUD for each sale price per ton of spodumene concentrate:
    For 1100 USD per ton: AUD 296,979,375
    For 1200 USD per ton: AUD 335,548,125
    For 1300 USD per ton: AUD 374,116,875
    For 1400 USD per ton: AUD 412,685,625
    For 1500 USD per ton: AUD 451,254,375



    PMT needs the grades to support their massive CAPEX and OPEX requirements. We can do just fine with 1.1%.

    Last edited by Naydoe: 31/05/24
 
watchlist Created with Sketch. Add WR1 (ASX) to my watchlist
(20min delay)
Last
76.5¢
Change
0.005(0.66%)
Mkt cap ! $164.5M
Open High Low Value Volume
76.5¢ 78.0¢ 74.5¢ $493.9K 651.4K

Buyers (Bids)

No. Vol. Price($)
2 43997 75.0¢
 

Sellers (Offers)

Price($) Vol. No.
77.0¢ 10476 3
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
WR1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.