A first attempt to calculate additional opex for hauling ore from Adina to Renard = 6.25 USD per tonne of SC5.5 produced
That seems too low to me, what am I doing wrong?
Logistics:
- 80km road @ 50km/hr speed = 1.6hrs between sites
- renard to adina + load 30min + adina to renard + unload 30min = 4.2hrs per round trip
- 2 x 9hr shifts = 4 loads per truck per day
- 4 loads x 12 trucks x 150 tonne capacity = 7200 tonnes / day max
- 2.2mtpa ore to move per year
- say 310 working days / year = 7097 tonnes / day
Costs:
- 2 shifts x 12 trucks = 24 drivers
- @ 65k /yr CAD salary = 1.56m CAD /yr driver opex
- based on Caterpillar 793F, unloaded trip = 28 L diesel, loaded trip = 36 L diesel, @ 1.75 CAD / L = 112 CAD fuel per load = 1.66m /yr CAD fuel opex
- 12 Caterpillar 793Fs @ say 3.5m USD ea = 42m USD truck capex
Opex per tonne SC (phase 1):
- 2.2mtpa @ 1.3% grade and 73% recovery = 380ktpa SC5.5 produced
- 1.56m + 1.66m = 3.23m CAD driver + fuel opex
- 3.23m / 380k = 8.5 CAD / 6.25 USD additional opex per tonne SC5.5
- Forums
- ASX - By Stock
- WR1 General Discussion
A first attempt to calculate additional opex for hauling ore...
-
- There are more pages in this discussion • 2,704 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WR1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
59.5¢ |
Change
-0.025(4.03%) |
Mkt cap ! $126.5M |
Open | High | Low | Value | Volume |
61.0¢ | 62.5¢ | 58.0¢ | $980.0K | 1.635M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 14933 | 59.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
60.0¢ | 100 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 22499 | 0.600 |
4 | 27520 | 0.595 |
2 | 9352 | 0.590 |
7 | 114093 | 0.585 |
4 | 63976 | 0.580 |
Price($) | Vol. | No. |
---|---|---|
0.605 | 1569 | 2 |
0.610 | 18660 | 4 |
0.615 | 27499 | 4 |
0.620 | 9397 | 2 |
0.625 | 20697 | 2 |
Last trade - 15.58pm 03/10/2024 (20 minute delay) ? |
Featured News
WR1 (ASX) Chart |