WR1 6.85% 68.0¢ winsome resources limited

WR1 General Discussion, page-6101

  1. 49 Posts.
    lightbulb Created with Sketch. 230

    This is not about the recent drilling announcement.


    There is very limited data available for the 2018 program so this analysis is limited and speculative, just aiming to share my thought process.


    As always DYOR


    I have read through the original Adina drilling announcements completed by MTC, A few personal takeaways and key points from the announcements below.

    Takeaways and ideas.

    • I suspect the interpretation of the original Adina pegmatite plunge drove the original design of the 2022 Jamar diamond drill holes (See figure 1, 2 and 4).


    • Adina mains thick pegmatite intercepts are along strike of Jamar drilling intercepts.


    • The 5 to 10 metre intercepts look very similar to the pegmatite intercepts down the fwl of the main pegmatite at Jamar.

    • I have not been able to find any info on intercepts holes AD18-008 and AD18-009 but would go down the footwall like the start of hole AD22-009 which only intercepted pegmatite at 147 odd metres.

    • Holes AD18-004 and AD18-006 have significant pegmatite intercepts 28.76m and 33.85m respectively. These thicker pegmatite intercepts are weakly mineralised and could be the strike extension of the Jamar pegmatite. If the pegmatite at Adina has the same dip direction as Jamar the other drilling at Adina could have missed the pegmatite.


    • The isolated spodumene mineralisation within the pegmatite dyke could be a zonation change in the main pegmatite, if indeed it is one and the same.


    • This is reassuring that the pegmatite system is continuous from Jamar to Adina but unfortunately does not confirm.


    • I’M eagerly awaiting an announcement of the gravity survey data



    MTC Announcement released on the 19th of February 2018.


    · The dip of the pegmatite was unknown at this point (Figure 4).


    · Drill holes were drillied on an Azi of 160 and designed to cross cut the approximate pegmatite trend suspected to be dipping to the north west.

    https://hotcopper.com.au/data/attachments/5002/5002584-c56769e2bb5b745ec6583c0c52d02644.jpg

    Figure 1. 2018 Adina drill hole info

    https://hotcopper.com.au/data/attachments/5002/5002579-10834fa1503c2db6c8bed153e95659aa.jpg

    Figure 2. 2022 Jamar drill hole info

    https://hotcopper.com.au/data/attachments/5002/5002591-d499d6eb3e56c8ea05827661289509f0.jpg

    Figure 3. Low confidence in pegmatite dip.

    https://hotcopper.com.au/data/attachments/5002/5002588-79421abcac0f2b085b75faacfdec492f.jpg

    Figure 4. cross section from MTC 2018 drill program. Approximate pegmatite trend dipping to the north west.

    MTC announcement dated 14th of May

    · Mentions pegmatite intercepts up to 50m thick. Only pegmatite intercepts of ~35m are reported in detail. Figure 5 and figure 6.


    · Mentions holes AD18-008 and AD18-009 will be reported when data is collected. I have not been able to find any data

    https://hotcopper.com.au/data/attachments/5002/5002596-581199f2627a665aa5d8256b845a2ce1.jpg

    Figure 5. Key info from drilling program

    https://hotcopper.com.au/data/attachments/5002/5002602-47c3887c0404f866c6ca9ab5c46a590b.jpg

    Figure 6. Pegmatite intercepts

    https://hotcopper.com.au/data/attachments/5002/5002599-402ede065214c7cc38f8b964c990057a.jpg


    Figure 7. Looking north east. Black box outlines 2018 drilling. Yellow circle highlighting thick pegmatite intercept.

 
watchlist Created with Sketch. Add WR1 (ASX) to my watchlist
(20min delay)
Last
68.0¢
Change
-0.050(6.85%)
Mkt cap ! $147.1M
Open High Low Value Volume
73.0¢ 73.0¢ 68.0¢ $388.7K 552.5K

Buyers (Bids)

No. Vol. Price($)
2 8049 68.0¢
 

Sellers (Offers)

Price($) Vol. No.
70.0¢ 12950 1
View Market Depth
Last trade - 16.10pm 15/07/2024 (20 minute delay) ?
WR1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.