WR1 11.7% $1.10 winsome resources limited

WR1 General Discussion, page-28733

  1. 1,198 Posts.
    lightbulb Created with Sketch. 1780
    The LGA timeline for Route 167 is old news. It's now likely to be CMIF funded and I hear from a Canadian lithium insider (not connected to WR1) that the whole extension (ie beyond Adina and up to the TT highway) is anticipated to be ready by 2028. A haul road from Renard to Adina is a much smaller project.

    A conversion facility could be completed in 1.5 years, so there is still plenty of time to make a deal with a converter who will presumably set up in Becancour.

    My thoughts on a deal have changed a bit since the initial euphoria. I think the best strategy is to put off signing binding offtakes for as long as possible, because it's a sellers' market for M&A and as Adina grows and Adina-Renard derisks there's a very good chance RIO or a similar player will just acquire the whole thing.
    Last edited by dtab: 29/04/24
 
watchlist Created with Sketch. Add WR1 (ASX) to my watchlist
(20min delay)
Last
$1.10
Change
-0.145(11.7%)
Mkt cap ! $209.8M
Open High Low Value Volume
$1.24 $1.24 $1.06 $3.565M 3.128M

Buyers (Bids)

No. Vol. Price($)
3 18454 $1.10
 

Sellers (Offers)

Price($) Vol. No.
$1.14 2600 1
View Market Depth
Last trade - 16.10pm 30/05/2024 (20 minute delay) ?
Last
$1.10
  Change
-0.145 ( 12.5 %)
Open High Low Volume
$1.25 $1.25 $1.07 698750
Last updated 15.58pm 30/05/2024 ?
WR1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.