Page 3 Preproduction capex A$299mm.They have spent a big chunk of the by now. Looking at the March 2021 CR presentation, they still have $120 mm to spend this FY and $42 mm the next, to complete.
Week 34 Wrap: HotCopper's top watched; Oz banks cut saver interest; Kamala’s 28% corporate tax; AI’s back
CC9 Chariot locks in high-potential drill target at Black Mountain, one of the USA's largest lithium landholdings
SER How flooding did Strategic Energy Resources a favour: Four holes down in 'redesigned' gold & copper campaign