    Mike,

    I believe you are in the correct general direction with your comments that WSA will be a low-cost/high margin miner and hence the reason why we have all filled up on them, however you're making quite a few errors with the JBM comments.

    Your comments on JBM grades and costs must be made in the context of where they were mining at the time (eg. lately has been a transition period from Cosmos Deeps to let's say the "outer" Alec Mairs and Tapinos deposits - make no mistake, when they were in the guts of Cosmos and Cosmos Deeps, the grades were up there with WSA stuff and costs halved

    - Sinclair is at shallow depth so grades/costs must be taken in that context
    - the 0.7% stuff was Anomoly 1 which was/will be left on the backburner for yrs given evrything else they have

    Not being critical - I think it's great that you are taking the time to dig for info and try and attatch a resultant valuation - just that some of those valuations are let's say 'skewed' through JBM numbers not being used to form the correct picture

    When WSA told us the cash cost figure a few mths ago, I looked back through JBM's figures myself - don't know if this will format properly or if indeed anyone is interested but may help someone
    - don't forget to cross-reference them with the production story at the time:

    Financial Statistics at June 30, 2007 (Unaudited) 1, 2

    Revenue/Costs – A$’000

    June

    Quarter

    Financial

    Year

    Sales Revenue (including FOREX adjustments) 72,297 ¹ 400,080 ¹

    Mine Costs (21,429)¹ (83,569)¹

    Amortisation and Depreciation (5,123) (22,141)

    Royalty (2,356)¹ (11,378)¹

    Administration – Corporate (net) 1,570 1,048

    Unit Costs – A$/lb Payable Ni

    June

    Quarter 2

    Financial

    Year 2

    Mining 1.52 1.24

    Milling 1.00 0.62

    Administration 0.90 0.59

    Transport 0.17 0.14

    Smelting/Refining (net of by-product credits) 3.35 2.55

    Cash Operating Unit Cost 6.94 5.14

    Royalty 0.99 0.59

    Amortisation, Depreciation and Rehabilitation 1.61 1.24

    Total 9.54 6.97

    *************************************

    Financial Statistics at June 30, 2006 (Unaudited) ¹

    Revenue/Costs – A$’000 June Quarter Financial

    Year

    Sales Revenue (including FOREX adjustments) 148,978 ¹ 261,437 ¹

    Mine Costs 37,439 ² 75,324

    Amortisation and Depreciation 6,953 27,666

    Royalty 3,958 6,991

    Administration – corporate (net) 1,558 ³ 9,624 ³

    Unit Costs – A$/lb Payable Ni June Quarter Financial

    Year

    Mining 0.73 0.90

    Milling 0.34 0.38

    Administration 0.28 0.29

    Transport 0.09 0.08

    Smelting/Refining (net of by-product credits) 1.38 1.38

    Cash Operating Unit Cost 2.82 3.03

    Royalty 0.32 0.26

    Amortisation, Depreciation and Rehabilitation 1.01 1.17

    Total 4.15 4.46

    ********************************

    Financial Statistics at June 30, 2005

    Revenue/Costs – A$’000 June Quarter Year to Date

    Sales Revenue 56,911 230,603

    Mine Costs 21,146 72,311

    Amortisation, Depreciation and Rehabilitation 5,625 21,133

    Royalty 1,540 6,429

    Administration – corporate (net) 1,536 1,621

    Exploration 7,221 23,201

    Unit Costs – A$/lb Payable Ni June Quarter Year to Date

    Mining 0.98 0.83

    Milling 0.37 0.33

    Administration 0.29 0.26

    Transport 0.08 0.07

    Smelting/Refining (net of by-product credits) 1.31 1.28

    Royalty 0.26 0.25

    Amortisation, Depreciation and Rehabilitation 1.02 0.92

    Total 4.31 3.94

    *******************************************

    Financial Statistics at 30 June 2004

    Revenue/Costs – A$’000 June Quarter Year to Date

    Sales Revenue 67,140 235,371

    Mine Costs 16,964 62,360

    Amortisation/Depreciation 4,631 15,857

    Royalty 1,332 4,996

    Administration - corporate 256 399

    Exploration 821 6,792

    CAPEX – Cosmos Deeps 1,084 11,068

    CAPEX – Cosmos South 613 2,181

    Unit Costs – A$/lb Payable Ni June Quarter Year to Date

    Mining 0.52 0.51

    Milling 0.24 0.26

    Administration 0.23 0.21

    Transport 0.07 0.07

    Smelting/Refining 1.47 1.46

    Royalty 0.20 0.20

    Amortisation/Depreciation 0.68 0.63

    Total 3.43 3.34

    *************************

    QUARTERLY REPORT

    FOR THE PERIOD ENDED June 30, 2003

    Another milestone was reached late in the quarter, with the first ore produced from underground. The Ilias Decline reached the target elevation for the first cross-cut at the end of May, with the first round fired in the 9995 level cross-cut on 4th June. The first Cosmos Deeps underground ore was accessed on June 16th at the top of the orebody, and a total of 4,684 tonnes at 8.15% nickel was hauled to the surface for the quarter.

    Mining in the open pit occurred between the 338.5m RL and the 320m RL during the quarter, approximately 155m below surface. Although the operating area has decreased as mining of the open pit nears completion, operations were well managed, with safe and steady progress being maintained. It is planned to complete the mining of the open pit by the end of July 2003, with the final floor at 307m RL, and a ‘goodbye cut’ to the 303m


    Revenue/Costs – A$’000
    June Quarter
    Year to Date

    Sales Revenue
    58,013
    153,612

    Mine Costs
    15,745
    56,308

    Amortisation/Depreciation
    3,714
    13,095

    Royalty
    924
    3,974

    Administration - corporate
    759
    3,289

    Exploration
    1,358
    5,555

    CAPEX – general
    2,339
    2,864

    CAPEX - Cosmos Deeps
    5,275
    18,272

    CAPEX – Cosmos South
    153
    153

    Unit Costs – A$/lb Payable Ni
    June

    Quarter
    Year to Date

    Mining
    0.28
    0.27

    Milling
    0.23
    0.29

    Administration
    0.13
    0.13

    Transport
    0.07
    0.07

    Smelting/Refining
    1.34
    1.41

    Royalty
    0.16
    0.16

    Amortisation/Depreciation
    0.55
    0.52

    Total
    2.76
    2.85



    *********************************************************************************************************************************************************************************************************************

    Performance statistics to 30th June 2002 are as follows:

    Production Statistics June Quarter Full Year Project to Date

    Ore Mined – tonnes 36,283 134,182 289,728

    Nickel Grade - % 8.19% 8.59% 8.45%

    Ore Treated – tonnes 33,700 130,354 279,465

    Nickel Grade - % 8.26% 8.68% 8.45%

    Nickel Recovery - % 96.9% 96.6% 93.4%

    Concentrate Produced - dry

    tonnes 13,883 56,440 116,223

    Plant Availability - % 97.4% 96.7% 96.3%

    Unit Costs – A$/lb Payable

    Ni

    June

    Quarter

    March

    Quarter

    Full Year Project to

    Date

    Mining 0.29 0.31 0.31 0.47

    Milling 0.30 0.28 0.31 0.33

    Administration 0.19 0.18 0.14 0.15

    Transport 0.07 0.06 0.07 0.07

    Total Mine Costs 0.85 0.83 0.83 1.02

    Smelt/Refine 1.46 1.48 1.45 1.41

    Total Production Costs 2.31 2.31 2.28 2.43

    Royalty 0.15 0.13 0.13 0.12

    Amortisation/Depreciation 0.60 0.59 0.57 0.64

    Total Costs 3.06 3.03 2.90 3.19

    In the pit, mining occurred between 375mRL and the 365mRL during the quarter

    (approximately 100 - 110 metres below surface). Operations were uneventful.

    **************************************************

    Performance statistics to 30th June 2001 are as follows:

    June Quarter Project to Date

    Ore Mined tonnes 27,033 155,547

    Nickel Grade 9.33% 7.63%

    Ore Treated

    tonnes 29,415 149,111

    Nickel Grade 9.87% 8.24%

    Nickel Recovery 96.2% 90.5%

    Concentrate Produced

    (dry tonnes) 14,423 59,786

    Concentrate Grade 19.4% 18.6%

    Plant Availability 94.3% 92%

    ************************************************************************

    Details to the June 30th 2000 are as follows:

    June Quarter Year to Date

    Actual Forecast Actual Forecast

    Ore mined

    Tonnes

    29,829 20,276 29,829 20,276

    Nickel grade 5.36% 3.52% 5.36% 3.52%

    Ore treated 18,734 20,276 18,734 20,276

    Nickel grade 5.27% 3.52% 5.27% 3.52%

    Nickel

    Recovery

    77.0% 65.8% 77.0% 65.8%

    Concentrates

    produced (dry)

    4,970 3,319 4,970 3,319

    Nickel grade 15.3% 14.3% 15.3% 14.3%

    Plant

    Availability

    97% 93% 97% 93%

    First ore was mined from the Cosmos pit in April and grades of the ore mined and milled

    during the quarter have been approximately 25% higher than the reserve grades.

    EXPLORATION

    Exploration undertaken during the June Quarter has focused solely on the Cosmos Deeps

    massive nickel sulphide deposit through an on-going program of diamond drilling. This

    work has comprised both expanding the known limits of the deposit by drilling the along

    strike and up / down dip extensions, as well as in-fill drilling in order to obtain samples

    for metallurgical test work and to confirm internal grade and width continuity.

    During this period, Jubilee completed 11 primary diamond drill holes and 10 sampling

    wedge holes, for a total of 7,065 metres. Down hole directional and electromagnetic

    (EM) surveys have also been carried out. Significant analytical results received since the

    end of the March Quarter are tabulated as an attachment to this report.

    Of the 20 primary holes completed, 12 have intersected massive nickel sulphides of

    economic significance, and a further 3 have intersected mineralisation of either sub-grade

    or of minor width. Mineralisation has been intersected between 450 – 600m below

    surface. It is located directly beneath the northeast quadrant of the open pit, at a depth of

    about 300m below the planned base of the pit.
 
watchlist Created with Sketch. Add WSA (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.