re: ** drilling results due Kunzia 1 oil exploration sidetrack well operated by ARQ was expected to take six days from 27th. October.
Offshore Flying Foam operated by ROC which is expected to take 10 days from commencement of drilling "on or around 30th. October 2005".
A positive result from either of these, particularly Flying Foam, will quickly fix up ARQ's chart.
As I have indicated before, the market seems to be ignoring the value to ARQ of future Cliff Head production which is not that far off.
- Forums
- ASX - By Stock
- ** xej soaring
re: ** drilling results due Kunzia 1 oil exploration sidetrack...
-
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 5GN (ASX) to my watchlist
(20min delay)
|
|||||
Last
14.5¢ |
Change
-0.005(3.33%) |
Mkt cap ! $44.26M |
Open | High | Low | Value | Volume |
14.5¢ | 15.0¢ | 14.5¢ | $92.68K | 639.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 425232 | 14.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
15.0¢ | 1966212 | 38 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 425232 | 0.145 |
10 | 3717884 | 0.140 |
10 | 644132 | 0.135 |
3 | 520699 | 0.130 |
1 | 250000 | 0.125 |
Price($) | Vol. | No. |
---|---|---|
0.150 | 1966212 | 38 |
0.155 | 1634272 | 15 |
0.160 | 351210 | 7 |
0.165 | 138000 | 2 |
0.170 | 25000 | 1 |
Last trade - 16.10pm 18/10/2024 (20 minute delay) ? |
Featured News
5GN (ASX) Chart |