CAY 1.37% 7.4¢ canyon resources limited

English version Thanks EnoinvestMinim-Martap Bauxite: Canyon...

  1. 796 Posts.
    lightbulb Created with Sketch. 231

    English version Thanks Enoinvest
    Minim-Martap Bauxite: Canyon Resources hires Vecturis to evaluate railway infrastructure

    Following the compilation of comprehensive rail traffic data, Vecturis developed a static traffic capacity model, followed by a dynamic simulation model using specialized railway modeling software.

    As part of the Banking Feasibility Study, the Australian company Canyon Resources, in a statement published on December 8, 2021, announces that it has hired Vecturis, a railway engineering consultant based in West Africa. This, to assess Cameroon's railway infrastructure and determine the necessary upgrades and the respective costs. It was also a question of "assessing rolling stock needs, modelling rail traffic capacity and, ultimately, ensuring optimized operation of the schedule," said the Canyon Resources statement. It goes without saying that the railway's traffic capacity determines the throughput of the Minim Martap project.

    Read also:Canyon Resources partners with China's MCC to develop Minim Martap's bauxite project

    It is in this sense that following the compilation of complete data on Cameroonian rail traffic, Vecturis has developed a static traffic capacity model, followed by a dynamic simulation model using specialized railway modeling software, thus targeting 5 million tons of bauxite per year. Regarding the dynamic simulation model Vecturis concluded that "rail traffic capacity is significantly better than previously expected. As a as a debit, the project's throughput has increased by more than 20%. An improvement over the project's pre-studyability (PFS) assumptions," says Vecturis.

    Read also:Mines: Canyon Resources to exploit 99.1 million tons of bauxite in Minim-Martap

    In addition to railway studies, a review of railway operating methodology, with the support of the Ministry of Transport and Cameroon Railway (Camrail), has identified other opportunities to increase tonnage and improve rail efficiency. In addition, ongoing negotiations with the Douala Port Authority (PAD) and Camrail have identified an alternative solution for rail unloading and barge loading at the port of Douala that will facilitate operations and easily take into account future increases in production. Along with the railway studies, China Minmetals Corporation 'S(MCC) subsidiary Zhongye Changtian International Engineering Co., Ltd. (MCC CIE) has developed the operating schedule, transport route, inland railway facility (IRF) and port designs," Canyon Resources said.

    Read also:Mining: Canyon Resources mobilizes 3.4 billion for the Mini-Martap project

    Last edited by sub7: 16/12/21
 
watchlist Created with Sketch. Add CAY (ASX) to my watchlist
(20min delay)
Last
7.4¢
Change
0.001(1.37%)
Mkt cap ! $101.7M
Open High Low Value Volume
7.1¢ 7.4¢ 7.0¢ $16.56K 232.8K

Buyers (Bids)

No. Vol. Price($)
1 100000 7.1¢
 

Sellers (Offers)

Price($) Vol. No.
7.4¢ 20000 1
View Market Depth
Last trade - 15.38pm 01/07/2024 (20 minute delay) ?
CAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.