Hi Everyone, with us being in the second week since the wire lining operations I would hazard a guess the rig is still setting up for flaring operations.
It is a very long and intensive process to set up all the equipment, the pipework, rig the flare boom, firefighting and sprinkler equipment, surge tanks, methanol tanks, choke manifolds, surface BOP, and resulting command and control modules and testing shack.
Then the whole system will need to be pressure tested and planning done before the system will get the OK to flare the well...
Two weeks to set up for a first well test sounds OK to me....
What I'm saying is , have a little more patience, if we begin flaring in the next few days that would be a great xmas present, don't ya think???
Merry Xmas All, I'm lucky enough to be home this year, but head back on Sunday to work...
Johnnpaull
- Forums
- ASX - By Stock
- FAR
- Xmas Gift...???
Xmas Gift...???
-
-
- There are more pages in this discussion • 91 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FAR (ASX) to my watchlist
|
|||||
Last
50.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $46.66M |
Open | High | Low | Value | Volume |
50.5¢ | 50.5¢ | 50.5¢ | $14.48K | 28.69K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 5356 | 50.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
51.0¢ | 59999 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 30878 | 0.500 |
1 | 30000 | 0.495 |
2 | 28930 | 0.480 |
2 | 70000 | 0.475 |
2 | 78150 | 0.470 |
Price($) | Vol. | No. |
---|---|---|
0.525 | 69690 | 1 |
0.530 | 30000 | 1 |
0.535 | 30000 | 1 |
0.540 | 52471 | 2 |
0.550 | 82295 | 3 |
Last trade - 15.44pm 12/07/2024 (20 minute delay) ? |
Featured News
FAR (ASX) Chart |