BYE 1.64% 6.0¢ byron energy limited

The rig is contracted for late November. (Why not an exact...

  1. 2,740 Posts.
    lightbulb Created with Sketch. 368
    The rig is contracted for late November. (Why not an exact date!?)

    The drilling will take ~30 days.

    Will it be this:

    http://srcc.collegekiknowledge.com/wp-content/uploads/2015/12/ckk-santa4.jpg

    ORRRRRRrrrrrrrr...:

    http://3.bp.blogspot.com/-ZbgG8BpzY.../qNrR5FCoPeg/s1600/christmas starry night.jpg

    OV

    PS "Production is expected to start in late January 2018 or approximately 10 days after the rig leaves location upon final hook-up of production equipment."

    So this:

    https://www.weekendnotes.com/im/004/02/nye-under-the-stars-sydney1.jpg

    PPS This is the BUY signal, with relatively low risk.
 
watchlist Created with Sketch. Add BYE (ASX) to my watchlist
(20min delay)
Last
6.0¢
Change
-0.001(1.64%)
Mkt cap ! $64.72M
Open High Low Value Volume
6.4¢ 6.4¢ 5.7¢ $36.83K 614.8K

Buyers (Bids)

No. Vol. Price($)
3 600000 5.6¢
 

Sellers (Offers)

Price($) Vol. No.
6.0¢ 103244 1
View Market Depth
Last trade - 16.10pm 03/05/2024 (20 minute delay) ?
Last
5.9¢
  Change
-0.001 ( 3.28 %)
Open High Low Volume
6.5¢ 6.5¢ 5.7¢ 124196
Last updated 15.59pm 03/05/2024 ?
BYE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.