TMT 0.00% 26.0¢ technology metals australia limited

Yarrabubba Estimates

  1. 769 Posts.
    lightbulb Created with Sketch. 275
    @Troydt

    Heres the numbers i worked from to get my estimates. Source from the two bridge street reports.

    Bridge street report from December
    https://www.tmtlimited.com.au/sites/default/files/research_reports/TMT%20December%202020%20FINAL.pdf
    https://www.tmtlimited.com.au/sites/default/files/research_reports/TMT%20November%202020%20FINAL.pdf

    Tonnes 28,000,000
    Recovery 50%
    Tonnes Product 14,000,000
    Mill Throughput yearly 3,000,000
    Mine life just over 9 years

    64%FE
    1.7% V2o5
    $100-$160 USD per Tonne
    + V Credits
    0.77 exchange rate
    $130-$205 AUD per Tonne

    About 10% recovery for Titanium
    Tonnes product 1,400,000
    $200 USD per Tonne
    0.77 exchange rate
    $260 AUD per Tonne

    OPEX $31 per Tonne after credits- This may be a bit low (about 550-600km to port)
    -FEX 490km to port with OPEX around $80

    CAPEX $160,000,000
    For the NPV I used an 8% discount rate (**s DFS used 8%)

    Currently 150,141,000 shares on issue
    15,200,000 unlisted options
    2,650,000 performance rights






 
watchlist Created with Sketch. Add TMT (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.